Members must be signed in to access discounts. For instructions click here.
Tour major renovations and additions at this famed institution for the visual and performing arts. Gabe Oliver and Dan Waldo, project managers with design-builder GCS-SIGAL, and Christoffer Graae, FAIA, Principal-in-Charge with the architects LBA-CGS JV lead a tour of the 265,000-square-foot project.
The Wharf features a four-story atrium with a new 800-seat theater, and new, large studios and rehearsal spaces. Because this is an active construction site, expect some uneven flooring and stair climbing.
$25 Museum Member | $35 Non-member. Registration begins February 21 by calling 202.272.2448 during business hours, and will be assigned based on space availability. On-site registration is not available.
Photo: Construction of the Ellington Theater in the new Atrium. Photo by Chris Ambridge Photography..