National Building Museum
 

Construction Watch Tour: St. Albans School Athletic Fields Renovation


Renovations of Washington, D.C.’s, St. Albans School athletic fields include the addition of eight accessory structures; tennis pavilion, spectator and locker room facilities; and a storage facility tucked beneath the main athletic field terrace. The design team from Bonstra | Haresign Architects and WMC Landscape Studio will lead a tour of the project, which features fieldstone walls, quoined brick openings, and bluestone caps that pick up the materiality of the existing school and cathedral grounds.

2.0 LU HSW (AIA) / 2.0 CM (AICP) / 2.0 PDH (LA CES)
Open only to Museum members 18 years and older, $35. Members of The Corinthians and The Builders receive advance registration beginning April 20, by calling 202.272.2448 from 10 am–5 pm, Monday through Friday. General membership registration by phone begins at 10 am on April 27, and will be assigned based on space availability. To upgrade your membership, please contact the Membership Office at 202.272.2448. Please note: most tours require extensive stair climbing. On-site registration is not available.

Photo: St. Albans athletic field stadium seating. Rendering courtesy Bonstra | Haresign Architects.

Date:
Time: 10:00 AM - 12:00 PM

This event does not require an RSVP. Registered users can request event reminders.
Register